Update: trailer is loaded for another trip next week with part of the shop, metal bandsaw, cabinets and benches, some tooling etc.
My last mission was to gut the shop that is out there (24x40) and this time down we will drywall the ceiling, sheet the walls and paint it out. Then move in the cabinets and tools that can go into place. Should be a fun trip.
House here in the O is now up for sale after several months of refirb: link to MLS :
https://www.realtor.ca/real-estate/25416916/33-lauder-road-oro-medonte
No shop pics as I don’t want to have snoopers. 4 showings so far, not much feed back other than the shop is nice. …LOL.
Lots of great content and conversations happening on here that I am missing - Dang it! Hope to be more active in a few short months!!