I was supposed to have a custom system built for my shop in 3/4 half halo, with 1/2" drops all in black pipe. Customer was going to pipe it all. Tired of waiting and tripping over hoses on the floor. I've done systems in PVC, no failures, but not doing that here. Considering pex based system, copper ($$$ ouch), or a rapidair type system .
I'm ruling out iron if i have to deal with threading. It will never get done. No time.
Shop is 36x50, so the half halo 3/4" mainline would be around 110', with a total of 8 drops. The drops can be 1/2". Likely the whole system could be 1/2" but if i ever get an apprentice, i want to make sure we don't have pressure drops. The 1/2" drops would be 10' long (14' ceiling).
Looking at rapidair type systems online, I haven't found a customizable system, just packages. Makes me lean towards a pex based system. If i need to add to it in the future, running to HD is more attractive than chasing down a proprietary fitting.
Any thoughts? Experiences?
I'm ruling out iron if i have to deal with threading. It will never get done. No time.
Shop is 36x50, so the half halo 3/4" mainline would be around 110', with a total of 8 drops. The drops can be 1/2". Likely the whole system could be 1/2" but if i ever get an apprentice, i want to make sure we don't have pressure drops. The 1/2" drops would be 10' long (14' ceiling).
Looking at rapidair type systems online, I haven't found a customizable system, just packages. Makes me lean towards a pex based system. If i need to add to it in the future, running to HD is more attractive than chasing down a proprietary fitting.
Any thoughts? Experiences?