Yup, I'd definitely do the work myself.There are ways to save substantially. If you do all the trenching, and install the correct size/grade of pipe for the electrical pull, you can easily save $1000.
I always recommend pulling in pipe rather than burying the cable directly. This leaves your options open. It is not code, but I bury a PT 2X6 on top of the pipe during the refill, as an added anti-digging measure. Cheap insurance.
If push comes to shove and I have to move the service I may have shot myself in the foot as I built my lean-to over the area where the trench would have to go
And the gas line goes down that side of the garage as well...
Last edited: