I finally have my solar power setup going in the new workshop. The lights work great! The grinders work great! The hand power tools work great!
The 240V split phase 3HP motors, not so much. The compressor threatens to start before the inverter trips off, and the power hammer manages to wiggle its flywheel momentarily. Sigh.
Though rated at 9kw continuous, and 26kw for 3 seconds, or 16kw for 10seconds, my loads are just too hard for this thing to start them. Annoyingly, my generator (Honda EU7000i) just gets them started, but of course, not when it's in line with the inverter.
So I'm looking at my options, and wonder if anyone has experience with split phase soft-starters. These look dodgy from all I can read.
I have an awkward feeling I'll be replacing the motors with 3-phase plus a VFD but would like to see if there's lower cost options to fail at before failing at starting the 3-phase motor successfully ;-)
The 240V split phase 3HP motors, not so much. The compressor threatens to start before the inverter trips off, and the power hammer manages to wiggle its flywheel momentarily. Sigh.
Though rated at 9kw continuous, and 26kw for 3 seconds, or 16kw for 10seconds, my loads are just too hard for this thing to start them. Annoyingly, my generator (Honda EU7000i) just gets them started, but of course, not when it's in line with the inverter.
So I'm looking at my options, and wonder if anyone has experience with split phase soft-starters. These look dodgy from all I can read.
I have an awkward feeling I'll be replacing the motors with 3-phase plus a VFD but would like to see if there's lower cost options to fail at before failing at starting the 3-phase motor successfully ;-)