140mower
Don
This project started over on the truing work in the 4 jaw thread, I thought I would give it it's own thread for those others who, like me, are too cheap to buy another pulley that actually fits.
First thing was to center it in the chuck. Then I bored it until the keyway just disappeared. I neglected to take a few pictures of the next bit so you will have to use the imagination a little bit as this tall lanky fella fumbles around in the pile of projects gone wrong for that perfect piece, and then turns it down .002" bigger than the hole previously bored.
I put the pulley on the woodstove and the plug into the freezer for a while and then pushed them together by hand.
Then, on the part line I drilled and tapped a 5/16" setscrew (Dutch key) to ensure it can't spin or work it's way out.....
...... To be continued, probably in the morning, the warden came back early.....
First thing was to center it in the chuck. Then I bored it until the keyway just disappeared. I neglected to take a few pictures of the next bit so you will have to use the imagination a little bit as this tall lanky fella fumbles around in the pile of projects gone wrong for that perfect piece, and then turns it down .002" bigger than the hole previously bored.
I put the pulley on the woodstove and the plug into the freezer for a while and then pushed them together by hand.
Then, on the part line I drilled and tapped a 5/16" setscrew (Dutch key) to ensure it can't spin or work it's way out.....
...... To be continued, probably in the morning, the warden came back early.....