Seems like a good time to move the thread here instead of continuing in the Member-Spotted Deals thread.
I figure I'll keep logging my progress here.
This morning's job was getting the head squared away to the table. That meant taking one of my indicator stands apart, turning a shaft to fit both my collets and the indicator stand hardware, and another shaft to hold the test indicator.
The test indicator holder is particularly artisanal. That was the lumpy end of a scrap, cross-drilled and reamed to 4mm to match the indicator shaft, a quick hack-saw cut and then a clamp to hold the indicator firm. And by clamp, I mean a little pipe cutter I had lying around (red in the previous picture) - somehow my collection of nuts and bolts appears to have migrated to the cottage. Time to track down a good assorted tray of them.
Once that was done the actual tramming was pretty quick.
Next stop, T-nuts.
I figure I'll keep logging my progress here.
This morning's job was getting the head squared away to the table. That meant taking one of my indicator stands apart, turning a shaft to fit both my collets and the indicator stand hardware, and another shaft to hold the test indicator.
The test indicator holder is particularly artisanal. That was the lumpy end of a scrap, cross-drilled and reamed to 4mm to match the indicator shaft, a quick hack-saw cut and then a clamp to hold the indicator firm. And by clamp, I mean a little pipe cutter I had lying around (red in the previous picture) - somehow my collection of nuts and bolts appears to have migrated to the cottage. Time to track down a good assorted tray of them.
Once that was done the actual tramming was pretty quick.
Next stop, T-nuts.